Proposal:
K Kids
Target of Oportunity:
yes
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.25
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
8.75

15 min to center T0274151135 (south pole), not sure if right!
Last file integration, , Sun at -8.3 degrees altitude. Got 1 of 3 requested integrations.