Target of Oportunity:
No
Time Observed:
7.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.75
Total Program Time:
8

Chiron was restarted twice due to communication problems with the TCS
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2020-01-25 | 7.25 | 0.0 | 0.0 | 0.0 | 0.75 | 8 |