Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

DIMM down at 02:21 UT. Back around 03:40 UT
YZ CMi @ 02:42 UT, overcast, waiting. Started 02:48 UT. Stopped at integration #36 at 480 seconds, time.
Around 07:10 UT, tablet lost connection to "CAGVM2" site (detectors), tested other sites and network is up, it seems a problem of CAGVM2 only. Wrote to Marco B.
Last object integration, Sun at -9.5 degress altitude.