Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
8.75
DECam engineering night. Star flats taken in the 8 filters installed: N964, u, g, r, i, VR, z and Y. All done without any problem.
Photometric night but with variable seeing (0.9''-2.5'') and windy (with wind gusts of ~20mph). Side doors had to be close twice due to the high wind speed.