Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
9

Stopped AU Mic at integration # 39, HA>5 airmass 2.35
PM04574+1356 was beyond limits: I did waited until 4 UT (lost 35 minutes; did 5 tries before but dome disconnects.)
Thanks to Humberto Orrego who found the evaporator of the AC unit was covered by an ice sheet.