Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.75
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.25
Time lost other:
0.0
Primary Investigator:
Todd Henry
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.5

Line 21, TOI-852, added a ThAr_Fiber lamp.
It was needed to wait for 'eta Car' to be observable. Just in case, added it a ThAr_Slicer lamp