Proposal:
2019B-0080
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
1.25
Time lost other:
0.25
Description:
DECam u-Band Imaging of the HETDEX/SHELA field
Primary Investigator:
Casey Papovich
Email:
Institution:
Texas A&M
Instrument:
CTIO 4m DECam
Total Program Time:
9.25

There was a small earthquake that messed up the guiding for one of our frames (so we had to trash that image) but besides that it was great -- besides some variable seeing (which can't be helped).