Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
10.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
21

All night closed due to Overcast. Around 8 UT, ctiomac3 was "graphically frozen", it took like 10 minutes to wake up. Even though there were no observations, I have stared "calib2"