Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
3.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
13.5

04:50 UT closed: condensation and 77% RH: foggy (CTIO weather station down at 6:30UT.) Reopened at 07:45 UT based on visual inspection + LCO and MEarth stations.
Underline than the seeing was greater than 3 arc-sec, reached at less 7 arc sec.
Thanks to the Mechanics team for their works with the dome shutter.