Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.5

Even though tonight the dome shutter closed with no problems,I will appreciate if Mechanics can take a look of the dome shutter.
Thanks in advance.