Proposal:
2019A-0315
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
MISHAPS bulge transit survey
Primary Investigator:
Matthew Penny
Email:
Institution:
Ohio State University
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25

Another successful night with good conditions and lots of data taken.
Note that the guider search_radius and isolation_radius parameters should be reset to their defaults in the Architect console - this has not been done yet.