Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12

At the beginning of the night Andrei Tokovinin (by telephone), Humberto Orrego and I re-aligned the fiber/slicer of CHIRON.
Calibrations in the afternoon were not taken.