Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Total Program Time:
12

TCS Monitor lost power due to power strip failure. Had to be plugged into a different outlet in order to continue observations.
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-07-04 | 11.5 | 0.0 | 0.5 | 0.0 | 0.0 | 12 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/16224/delete?destination=print/node/15952
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/16224/edit?destination=print/node/15952
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/15952?destination=print/node/15952
First night of extra turno and training of Mr. Azmain Nisak.
Training went well and program was completed sucessfully.