Target of Oportunity:
No
Time Observed:
12.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12

Second night of Hodari's training, he took the control of the telescope several times along the night. Well done!!!
The program was completed successfully.