Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9

Along the night the corrections of the guider in DEC were high, which produced the lost of signal in some spectra. If it is possible, please check the balance of the telescope in DEC.
The program was completed successfully.