CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO 1.5-m 2018-11-06

ENR CTIO 1.5-m 2018-11-06

Date: 
Tuesday, November 6, 2018
Telescope: 
CTIO 1.5-m
Submitter: 
Rodrigo Hinojosa
Submitter Email: 
rhinojosa@ctio.noao.edu
Observer Support: 
None
Night Assistant: 
Rodrigo Hinojosa
Problems: 

At the beginning of the night I noticed that the air conditioning in the computer room was off, I tried to turn it on but it did not work, so I called Humberto Orrego to help me. Humberto reviewed the entire system, he realized that not only the air conditioning but several devices (not UPS) had problems with the power supply . Once the analysis was done, Humberto noticed that the problem was greater than expected, so it has to be solved tomorrow by the Telops staff.

Due to the above, tonight we observed without the air conditioning system in the computer room and with power supply problems in several devices. We have taken all the cautions and monitored the systems throughout the night, there were no failures and the observations could be made according to the established program.

Comments: 

@TELOPS: Please check the power supply on the facilities.

The program was completed successfully.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.80
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.70
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.80
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
4th Quarter
Clouds: 
Clear
Wind: 
Medium
Seeing Value: 
0.80
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
  • Delete
  • Edit
Program: 
Target of Oportunity: 
No
Time Observed: 
9.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Todd Henry
Email: 
thenry@astro.gsu.edu [1]
Institution: 
SMARTS
Instrument: 
CTIO 1.5m Echelle
Organization: 
SMARTS
Total Program Time: 
9
  • Delete [2]
  • Edit [3]
  • Add [4]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2018-11-06 9.0 0.0 0.0 0.0 0.0 9

Source URL (modified on 11/07/2018 - 06:04): http://www.ctio.noao.edu/noao/content/ENR-CTIO-15-m-2018-11-06

Links
[1] mailto:thenry@astro.gsu.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8093/delete?destination=print/node/14864
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8093/edit?destination=print/node/14864
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/14864?destination=print/node/14864