
There was a chicken! my notes on this below.
01:36 UT—pointing correction of +10, 0
768990 may have pointing correction issue
chicken sound at 01:38 UT, Hernan restarted TCS in response to this; unclear what caused the problem
lost about 10 minutes to this--I reported that below as 0.25 hours lost to technical because that was smallest unit.
last position before chicken was 21:35:??, -04:04:44 (both in HMS)
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-09-04 | 10.75 | 0.0 | 0.25 | 0.0 | 0.0 | 11 |
Links
[1] mailto:djschlegel@lbl.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/7180/delete?destination=print/node/14464
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/7180/edit?destination=print/node/14464
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/14464?destination=print/node/14464
None. Only problem was our scrambling to reorganize our plans to deal with chips being out; the scrambling caused some chaos with our scripts but I wouldn't call that a problem with the instrument!