Proposal:
DECam Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
10.25
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.25

SISPI was quite slow today. We have to kill and refresh the page from time to time.
I realized in the telemetry viewer that there was a peak at 04:30 in the LN2 Heater Power, Cryocoolers, Level, and LN2 diff pressure.