Proposal:
ENG
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
2.0
Time lost other:
0.0
Description:
COSMOS engineering
Primary Investigator:
Points
Email:
Institution:
NOAO
Instrument:
CTIO 4m COSMOS
Organization:
NOAO
Total Program Time:
10.75
Closed all night for clouds and high humidity for a time. Obtained focus data for the three new installed grisms and obtained flat fields for the new grisms. While we were closed data were taked to compute the detector transfer curve.