Proposal:
ENG
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering night
Primary Investigator:
Points
Email:
Institution:
NOAO
Instrument:
CTIO 4m ArCoIRIS
Organization:
NOAO
Total Program Time:
0
Engineering night for TS4. Daytime f/8 swap without any problems.
Worked with Manuel and Alberto to show them how to acquire objects on the slit and provide general troubleshooting.
Worked with Matthew Hankins and Terry Herter from Cornell to test remote observing procedures in advance of their run on 05 June.