
None.
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2017-03-08 | 9.5 | 0.0 | 0.0 | 0.0 | 0.0 | 9.5 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-conditions/3785/delete?destination=print/node/11477
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-conditions/3785/edit?destination=print/node/11477
[3] mailto:dnidever@noao.edu
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3786/delete?destination=print/node/11477
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3786/edit?destination=print/node/11477
[6] mailto:azenteno@ctio.noao.edu
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3787/delete?destination=print/node/11477
[8] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3787/edit?destination=print/node/11477
[9] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/11477?destination=print/node/11477
First half: remote observing from La Serena (K. Vivas). Communication with the dome was made via skype in the new tablet. It worked great. Thank you!