Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Friedman
Instrument:
CTIO 4m DECam
Total Program Time:
10
Windscreens up. At 05:20 -05:40 (UTC) there was a spike in the ellipticity, but this quickly appeared to return to normal.