Proposal:
f/8 and TripleSpec4 engineering
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Points
Email:
Institution:
CTIO
Instrument:
CTIO 4m ArCoIRIS
Organization:
NOAO
Total Program Time:
10
None.