Proposal:
2016A-0190
Target of Oportunity:
No
Time Observed:
11.0
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Legacy Survey Extension
Primary Investigator:
Arjun Dey
Email:
addy@noao.edu [1]
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
12
No afternoon calibrations taken due to DECam ICS failures. Thanks to Humberto and Rodrigo for leading the revival. CCD temperaturee stable by 0100 UT. Apparent vapor lock on the LN2 supply side of the Imager clared at the time of the dome shutters being opened. If the LN2 pump needs to be restarted iat any time in the future, best to have the telescope at the NW platform and not at the zenith.