One shutter error, smooth recovery.
2 noncritical occlusion alarms.
2nd Half:
no problems
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-02-03 | 8.5 | 0.0 | 0.0 | 0.0 | 0.0 | 8.5 |
Links
[1] mailto:frieman@fnal.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1364/delete?destination=print/content/enr-soar-4-m-2014-02-03
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1364/edit?destination=print/content/enr-soar-4-m-2014-02-03
[4] mailto:kilic@ou.edu
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1365/delete?destination=print/content/enr-soar-4-m-2014-02-03
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1365/edit?destination=print/content/enr-soar-4-m-2014-02-03
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/5010?destination=print/content/enr-soar-4-m-2014-02-03
Observing Team
DES Observers: Steve Kent, Alex Drlica-Wagner
Telops: Hernan Tirada
Remote Support: Klaus Honscheid
Observing Plan
Half-night plan
Conditions
Accomplishments
Problems tagged as Synopsis_Problem
Minor Problems and Relevant Information
Notes for Data Management
-------------------------- END DES -------------
2nd Half:
Ellipticity was high (~0.2) towards the end of the night, although telescope was moving toward ever higher ~2 airmass.