Proposal:
newfirm_default
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
NEWFIRM AEON
Primary Investigator:
G. Damke
Email:
Institution:
CTIO
Instrument:
CTIO 4m Newfirm
Organization:
NOAO
Total Program Time:
8

AEON observations with NEWFIRM. Everything worked smoothly.