Proposal:
2024B-388081
Target of Oportunity:
No
Time Observed:
6.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.5
Time lost other:
0.0
Description:
Wide Fast Deep with DECam
Primary Investigator:
Peter Nugent
Email:
penugent@lbl.gov [1]
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
7.25
Very cloudy for the first half, lost about 15 minutes at the start of the night due to it being overcast. The sky cleared up in the latter half.