CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2024-04-02

ENR CTIO Blanco 4-m 2024-04-02

Date: 
Tuesday, April 2, 2024
Telescope: 
CTIO Blanco 4-m
Submitter: 
Damián Pacheco, Imri Dickstein, Rinat Damari
Submitter Email: 
dampach@uc.cl
Observer Support: 
Manuel Hernandez
Night Assistant: 
Claudio Aguilera
Also Present: 
Rodrigo Hernandez, Rodrigo Hinojosa, Imri Dickstein, Rinat Damari
Problems: 

Interlock SISPI broken (23:55, 03:08)

Problem in communication between SISPI and DECAL (20:48)

Comments: 

left behind the schedule in the end, so some exposures were skipped.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.06
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
1
2nd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
0.91
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
1
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.95
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
0.97
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
  • Delete
  • Edit
Program: 
Proposal: 
2023A-643849
Target of Oportunity: 
No
Time Observed: 
5.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Photometric Time Series of Eta Carinae's Great Eruption
Primary Investigator: 
Armin Rest
Email: 
arest@stsci.edu [1]
Institution: 
Space Telescope Science Institute
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5.5
  • Delete [2]
  • Edit [3]
Proposal: 
2023A-643849
Target of Oportunity: 
No
Time Observed: 
5.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Photometric Time Series of Eta Carinae's Great Eruption
Primary Investigator: 
Armin Rest
Email: 
arest@stsci.edu [1]
Institution: 
Space Telescope Science Institute
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5
  • Delete [4]
  • Edit [5]
  • Add [6]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2024-04-02 10.5 0.0 0.0 0.0 0.0 10.5

Source URL (modified on 04/03/2024 - 07:44): http://www.ctio.noao.edu/noao/content/enr-ctio-blanco-4-m-2024-04-01

Links
[1] mailto:arest@stsci.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43318/delete?destination=print/content/enr-ctio-blanco-4-m-2024-04-01
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43318/edit?destination=print/content/enr-ctio-blanco-4-m-2024-04-01
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43319/delete?destination=print/content/enr-ctio-blanco-4-m-2024-04-01
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43319/edit?destination=print/content/enr-ctio-blanco-4-m-2024-04-01
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/21472?destination=print/content/enr-ctio-blanco-4-m-2024-04-01