Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
10.0
Time lost other:
0.0
Description:
The Merian survey
Primary Investigator:
Rest
Instrument:
CTIO 4m DECam
Total Program Time:
10
None.