Proposal:
NEWFIRM engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
5.25
Time lost technical:
0.0
Time lost weather:
6.0
Time lost other:
0.0
Description:
NEWFIRM engineering
Primary Investigator:
Sean Points
Email:
Institution:
CTIO
Instrument:
CTIO 4m Newfirm
Organization:
NOAO
Total Program Time:
11.25
Got some useful data and worked on guider and software fixes. Clouds and poor seeing precluded taken more data to characterize detector performance.