Proposal:
2023A-237157
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
1.0
Time lost other:
0.0
Description:
YSE, DEBASS
Primary Investigator:
Narayan, Rest
Institution:
University of Illinois at Urbana-Champaign
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
11
No observations could be taken for the first hour due to clouds. At the end there was an error during the final script, which caused it to be delayed by about 10 minutes.