Proposal:
NEWFIRM Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
10.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
NEWFIM Engineering and Comissioning
Primary Investigator:
Points/Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m Newfirm
Organization:
NOAO
Total Program Time:
10.5
More progress made on the guider. They can send a separate report. Once the guider work was done, I took data of standard stars and measured the sky brightness as a function of lunar distance. Took some dep fields to determin observational limits. Rounded out the night taking some NB images of M83.