Proposal:
2023A-716082
Target of Oportunity:
No
Time Observed:
9.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Nir
Instrument:
CTIO 4m DECam
Total Program Time:
9.5
None.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-03-06 | 9.5 | 0.0 | 0.0 | 0.0 | 0.0 | 9.5 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/42219/delete?destination=print/content/enr-ctio-blanco-4-m-2023-03-06
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/42219/edit?destination=print/content/enr-ctio-blanco-4-m-2023-03-06
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/20115?destination=print/content/enr-ctio-blanco-4-m-2023-03-06
None.