Proposal:
COSMOS F/8 Engineering
Target of Oportunity:
No
Time Observed:
7.25
Time Engineering:
1.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
COSMOS F/8 Engineering
Primary Investigator:
Points
Email:
Institution:
CTIO
Instrument:
CTIO 4m COSMOS
Organization:
NOAO
Total Program Time:
8.75
None.