Proposal:
2021A-0149
Target of Oportunity:
No
Time Observed:
11.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.25
Description:
The DECam eROSITA Survey (DeROSITAS)
Primary Investigator:
Alfredo Zenteno
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
At 2:59 LT we suffered and earth quake. The mountain operators needed perform a complete check of the telescope. We were abck at the sky 10 minutes later.