Proposal:
2019B-CN01/1013
Target of Oportunity:
No
Time Observed:
7.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
NGFS
Primary Investigator:
Thomas Puzia
Email:
Institution:
Pontificia Universidad Catolica de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
7.75

Dome open at 09:04 due to high humidity.
From the std script, the fist exposure (y) if you delete it it also delete the pre setup for the coodinates. So we lost 5 min here.
Power cut. 10 min lost.