
Lost first 30 minutes of observations due to technical issues. There was a communication problem with the TCS, and SISPI had to be rebooted.
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2019-04-27 | 11.0 | 0.0 | 0.5 | 0.0 | 0.0 | 11.5 |
Links
[1] mailto:dfinkbeiner@cfa.harvard.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/9074/delete?destination=print/content/enr-ctio-blanco-4-m-2019-04-27
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/9074/edit?destination=print/content/enr-ctio-blanco-4-m-2019-04-27
[4] mailto:bob@lpl.arizona.edu
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/9075/delete?destination=print/content/enr-ctio-blanco-4-m-2019-04-27
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/9075/edit?destination=print/content/enr-ctio-blanco-4-m-2019-04-27
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/15624?destination=print/content/enr-ctio-blanco-4-m-2019-04-27
Lost first 30 minutes of observations due to technical issues. There was a communication problem with the TCS, and SISPI had to be rebooted.