CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2019-03-05

ENR CTIO Blanco 4-m 2019-03-05

Date: 
Tuesday, March 5, 2019
Telescope: 
CTIO Blanco 4-m
Submitter: 
Bob Blum
Submitter Email: 
rblum@lsst.org
Observer Support: 
Manuel Hernandez
Night Assistant: 
Claudio Aguilera
Also Present: 
Jackie Seron
Problems: 

At 22:00 image 280 finished normally. Then everything just stopped but with no indication anything had happened. After a few minutes Manual pushed sop and go in the Exposure queue wiht no apparent effect. Then he reconfigured SISPI on the console. 281 was aborted and 282 came into the queue and was executed. 

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
0.90
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
0.80
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.00
Seeing Variability: 
0.4
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
  • Delete
  • Edit
Program: 
Proposal: 
2014B-0404
Target of Oportunity: 
No
Time Observed: 
7.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECaLS
Primary Investigator: 
Schlegel and Dey
Email: 
dschlegel@lbl.gov [1]
Institution: 
Lawrence Berkeley National Laboratory
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
7.5
  • Delete [2]
  • Edit [3]
Proposal: 
2019A-0332
Target of Oportunity: 
No
Time Observed: 
2.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Trans Neptune
Primary Investigator: 
Sheppard
Email: 
ssheppard@carnegiescience.edu [4]
Institution: 
Carnegie Institutiion of Washington
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
2
  • Delete [5]
  • Edit [6]
  • Add [7]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2019-03-05 9.5 0.0 0.0 0.0 0.0 9.5

Source URL (modified on 03/06/2019 - 06:49): http://www.ctio.noao.edu/noao/node/15385

Links
[1] mailto:dschlegel@lbl.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8868/delete?destination=print/content/enr-ctio-blanco-4-m-2019-03-05
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8868/edit?destination=print/content/enr-ctio-blanco-4-m-2019-03-05
[4] mailto:ssheppard@carnegiescience.edu
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8869/delete?destination=print/content/enr-ctio-blanco-4-m-2019-03-05
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/8869/edit?destination=print/content/enr-ctio-blanco-4-m-2019-03-05
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/15385?destination=print/content/enr-ctio-blanco-4-m-2019-03-05