Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam Legacy Survey (DECaLS)
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
10

Major problem with bottom half of N10 CCD throughout most if not all of the night. Realized this problem was also present during previous night (night starting August 31).