Proposal:
ENG
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
7.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Points
Email:
Institution:
CTIO
Instrument:
CTIO 4m ArCoIRIS
Organization:
NOAO
Total Program Time:
7
We had the last engineering night of TSpec4 (ARCoIRIS) on the Blanco tonight. We observed some high proper motion M dwarfs and an SN. The telescope and instrument were hannded over to Markus Rabus at 3am local time.