Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.25
DES Night Summary link: http://des-ops.fnal.gov:8080/nightsum/nightsum-2018-02-12/nightsum.html
There are some leds near the LN2 tank above the old console room that are bright enough to light up part of the dome.
Great night, great run. Thanks!