Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
5.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECalS
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
5.25
None.
http://des-ops.fnal.gov:8080/nightsum/nightsum-2017-08-20/nightsum.html
No dome occlusions tonight.
DECam seeing was worse than site seeing, perhaps because the primary was cooler than the ambient nighttime temperature.