Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
4.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
7.25
Time lost other:
0.0
Description:
DECam Legacy Survey (DECaLS)
Primary Investigator:
Schlegel
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Total Program Time:
12
None.