Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
At UTC 09:30, there was a big slew in the observing plan: we added a break, and moved "manually" the telescope to the next pointing in 3-4 steps of 15 degrees each [in order to avoid interlocks].