CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2017-03-22

ENR CTIO Blanco 4-m 2017-03-22

Date: 
Wednesday, March 22, 2017
Telescope: 
CTIO Blanco 4-m
Submitter: 
Scott Sheppard
Submitter Email: 
sheppardss@yahoo.com
Observer Support: 
Tim Abbott
Night Assistant: 
Claudio Aguilera
Problems: 

Power went out near the end of the night but was quickly restored.

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Seeing Value: 
1.80
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
0
2nd Quarter
Clouds: 
Clear
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
3rd Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
  • Delete
  • Edit
Program: 
Proposal: 
2017A-0367
Target of Oportunity: 
No
Time Observed: 
9.25
Time Engineering: 
0.0
Time lost technical: 
0.25
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Extreme Trans-Neptunian Objects
Primary Investigator: 
Scott Sheppard
Email: 
sheppardss@yahoo.com [1]
Institution: 
Carnegie
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
9.5
  • Delete [2]
  • Edit [3]
  • Add [4]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2017-03-22 9.25 0.0 0.25 0.0 0.0 9.5

Source URL (modified on 03/23/2017 - 06:51): http://www.ctio.noao.edu/noao/node/11554

Links
[1] mailto:sheppardss@yahoo.com
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3816/delete?destination=print/content/enr-ctio-blanco-4-m-2017-03-22
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/3816/edit?destination=print/content/enr-ctio-blanco-4-m-2017-03-22
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/11554?destination=print/content/enr-ctio-blanco-4-m-2017-03-22