Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
9.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Total Program Time:
9.5
Telescope locked at NW platform in preparation for hexapod engineering.