Proposal:
2016B-4905
Target of Oportunity:
No
Time Observed:
5.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Australian Time
Primary Investigator:
Jerjen
Email:
Institution:
ANU
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
5.25
First Half Night:
5 minutes lost to DECam interface going down. around 11pm.
Second half night:
Had a humidity warning on one part of the instrument. Problem resolved by telops. No time lost due to warning.
Full summary here: http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-08-28/nightsum.html