Proposal:
2013B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
10.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam/Blanco engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.5
Spent the night doing various science while running in AOS8 mode, so science and engineering at the same time. All worked well.