CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2016-01-12

ENR CTIO Blanco 4-m 2016-01-12

Date: 
Tuesday, January 12, 2016
Telescope: 
CTIO Blanco 4-m
Submitter: 
Gregory Rudnick
Submitter Email: 
grudnick@ku.edu
Observer Support: 
Manuel Hernandez
Night Assistant: 
None
Also Present: 
David James
Problems: 

DIMM stopped working at 3:49 and never started up again.

Comments: 

See the DES summary at http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-01-12/nightsum.html

The small fridge in the main cafeteria under the cereal is off and has food in it.  I was unfortunate enough to open it and was bombarded by an incredibly foul stench from the warm interior.  It should be cleaned.

 

TASCA is not working.  While I could use the LCOGT cam, it was not as convenient as having the TASCA up and running, and refreshing, on the observer 2 console.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Thin Clouds
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
3
2nd Quarter
Clouds: 
Thin Clouds
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
3
3rd Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.40
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
3
4th Quarter
Clouds: 
Thin Clouds
Wind: 
Low
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
2
  • Delete
  • Edit
Program: 
Proposal: 
2012B-0001
Target of Oportunity: 
No
Time Observed: 
4.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DES
Primary Investigator: 
Frieman
Email: 
frieman@fnal.gov [1]
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4
  • Delete [2]
  • Edit [3]
Proposal: 
2014B-0404
Target of Oportunity: 
No
Time Observed: 
4.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECaLS
Primary Investigator: 
David Schlegel
Email: 
djschlegel@lbl.gov [4]
Institution: 
Lawrence Berkeley National Laboratory
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4
  • Delete [5]
  • Edit [6]
  • Add [7]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2016-01-12 8.0 0.0 0.0 0.0 0.0 8

Source URL (modified on 01/13/2016 - 06:10): http://www.ctio.noao.edu/noao/node/9189

Links
[1] mailto:frieman@fnal.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2868/delete?destination=print/content/enr-ctio-blanco-4-m-2016-01-12
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2868/edit?destination=print/content/enr-ctio-blanco-4-m-2016-01-12
[4] mailto:djschlegel@lbl.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2869/delete?destination=print/content/enr-ctio-blanco-4-m-2016-01-12
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2869/edit?destination=print/content/enr-ctio-blanco-4-m-2016-01-12
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/9189?destination=print/content/enr-ctio-blanco-4-m-2016-01-12