None. (apart from clouds!)
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-01-05 | 0.0 | 0.0 | 0.0 | 8.0 | 0.0 | 8 |
Links
[1] mailto:frieman@fnal.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2846/delete?destination=print/content/enr-ctio-blanco-4-m-2016-01-05
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2846/edit?destination=print/content/enr-ctio-blanco-4-m-2016-01-05
[4] mailto:dnidever@lsst.org
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2847/delete?destination=print/content/enr-ctio-blanco-4-m-2016-01-05
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2847/edit?destination=print/content/enr-ctio-blanco-4-m-2016-01-05
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/9140?destination=print/content/enr-ctio-blanco-4-m-2016-01-05
Reparation of the dome boggie bearings continued this afternoon.
Never opened. SMASH team gives up at 430 am ...